DC, Maryland, & Virginia

(240) 428-3537
Hours: 6:00AM-4:00PM

South Florida

(954) 928-9539
Hours: 7:30AM- 4:00PM

Custom Circular Swing Stage for Opa-Locka Air Traffic Control Tower – Opa-Locka, FL

Project Details

Do you have questions about our services?

Reach out today to see how Reach Services can help with your next project!

Project Snapshot

  • Project: Opa-Locka Air Traffic Control Tower
  • Customer: Construction Services International
  • Jobsite: Miami-Opa Locka Executive Airport (OPF), Florida
  • Project Type: Air Traffic Control Tower Restoration
  • Scope: Full exterior restoration and painting
  • Equipment Provided: Custom-designed six-motor circular swing stage system and system scaffold
  • Reach Services Role: Custom platform design, suspended access equipment, system scaffold, and installation labor
  • Engineering Support: Bee Access engineering team

Project Overview

Reach Services partnered with Construction Services International (CSI) to provide a custom suspended access solution for the full restoration and painting of the Opa-Locka Air Traffic Control Tower, located at Miami-Opa Locka Executive Airport (OPF) in Florida.

The tower’s distinctive shape required more than a conventional straight swing stage platform. Reach Services worked with the Bee Access engineering team to develop a custom-designed six-motor circular swing stage system configured specifically for the structure.

In addition to the suspended platform, Reach Services provided system scaffold to give crews access to the circular swing stage. Our team supplied the equipment and labor for the swing stage and system scaffold while also supporting the custom platform design.

The combined system created a purpose-built access solution that allowed CSI’s restoration crews to work around the tower exterior as they completed the restoration and painting scope.

Jobsite Challenges

The circular geometry of the air traffic control tower presented a unique suspended access challenge. A traditional straight swing stage would not provide the configuration necessary to effectively follow the tower’s exterior.

The elevated work area also required a practical way for crews to reach the suspended platform.

Reach Services needed to develop an integrated access system that addressed both requirements: a custom platform capable of providing access around the tower and a supported scaffold system that could provide crew access to the swing stage.

Custom Access Solution

Working with the Bee Access engineering team, Reach Services developed a custom six-motor circular swing stage configuration tailored to the tower.

The project solution included:

  • Custom design of a circular suspended platform
  • Six-motor swing stage configuration
  • System scaffold for access to the swing stage platform
  • Swing stage equipment and installation
  • System scaffold equipment and installation
  • Labor for the custom platform and access system

By combining custom-engineered suspended access with system scaffold, Reach Services provided CSI with one coordinated solution for accessing the tower exterior.

Results & Benefits

  • Provided a purpose-built suspended access system for the circular air traffic control tower
  • Designed a custom six-motor swing stage configuration for the structure
  • Integrated system scaffold to provide access to the suspended platform
  • Coordinated with Bee Access engineering on the custom platform design
  • Provided equipment and labor for both the swing stage and system scaffold
  • Supported CSI’s full restoration and painting of the tower
  • Demonstrated Reach Services’ ability to develop specialized access solutions for complex structures in South Florida

Need a Custom Swing Stage Solution for a Complex Restoration Project?

Not every structure can be accessed with a standard suspended platform.

Reach Services provides swing stage systems, custom suspended access, engineering and rigging support, specialty hoisting, and other access solutions for restoration, maintenance, painting, façade work, and specialty construction projects.

Whether a project involves unusual building geometry, challenging elevations, or a highly specialized work area, our team can help develop an access configuration designed around the needs of the job.

Contact Reach Services to discuss a custom suspended access solution for your next project.

RSVP Now Open House

We are excited to announce the grand opening of our new Resource HQ and Reach DMV facility! Join us for food, drinks, games, and great conversation at our new location.

  • Date: Friday, July 12, 2024
  • Time: 10:00 AM – 3:00PM EDT
  • Location: 4841 Walden Lane, Lanham MD 20706
Resource - Cars and Coffee Event
Join us for Cars and Coffee at Resource HQ. 
We welcome all makes and models!